Alaoa Hydropower Refurbishment: Samoa
Asian Development Bank | June 2017
Abstract
The upgrade and refurbishment the Alaoa Hydropower Plant consisted of a $1.5 million contract of works to increase the generation capacity and replace aging equipment. The Alaoa Hydropower Plant provides the grid with clean, low-cost, renewable energy and is a key power generation asset of the national power utility, Samoa Electric Power Corporation (EPC). The Alaoa Hydropower Plant was originally commissioned in 1959 and was due for a complete upgrade and refurbishment.
Citation
Asian Development Bank. 2017. Alaoa Hydropower Refurbishment: Samoa. © Asian Development Bank. http://hdl.handle.net/11540/7640. License: CC BY 3.0 IGO.Keywords
Rural planning
Aid coordination
Industrial projects
Infrastructure projects
Natural resources policy
Educational development
Development policy
Energy Demand
Alternative energy program
Domestic Energy
Energy
Energy Demand
Energy Sources
ADB
Alternative Energy Development
Asian Development Bank
Development
Development Cooperation
Rural Development Projects
Energy Development Finance
Renewable Energy
Energy
Communication in rural development
Communication in community development
Economic development projects
Development banks
Economic forecasting
Environmental auditing
Cumulative effects assessment
Human rights and globalization
Rural manpower policy
Biogas
Biomass chemical
Biomass gassification
Biomass energy
Demand
Energy Security
Renewable Energy Source
Supply and Demand
Technology
Solar energy policy
Development banks
Infrastructure
Joint venture
Energy policy
Renewable energy source
Solar energy
Energy development
Technology
Sun
Energy resource
Water power
Hydrology
Show allCollapse